遇见数据集

Redispatch

收藏
data.europa2024-06-25 收录
官方服务:

资源简介:

Renewable energy generation plants need to be reduced in their feed-in due to grid constraints in order to ensure grid stability. This process is called **redispatch**. The data shall include information on the number of hours and the number of EEG installations that had to be reduced in order to ensure grid stability. *Both the data of current and forecast EEG measures have been compiled with the greatest possible care and prepared for presentation. Nevertheless, in particular recording and transmission errors as well as incomplete delivery by third parties cannot be excluded. Schleswig-Holstein Netz AG therefore expressly reserves the right to change the published data and presentations and assumes no liability for the topicality, completeness and correctness.* Visualisation of the data: https://www.netzampel.energy/shnetz

二维码
社区交流群
二维码
科研交流群
商业服务