遇见数据集

Datainbrief-03.05.2022-all results

收藏
NIAID Data Ecosystem2026-03-13 收录
官方服务:

资源简介:

The excel sheets are results of experimental tests conducted by the author. Water permeability and chloride ion penetrability tests were conducted after 5 curing times; namely 2, 7, 28, 90 and 180 days. Concrete mixtures were prepared with six replacement levels of NNP; namely 0%, 1%, 2%, 3%, 4% and 5%, four water/binder ratios, namely 0.4, 0.5, 0.6 and 0.7. NP was ground to 2 different sizes; i.e. 100 & 500 nm.

创建时间:
2022-05-03
二维码
社区交流群
二维码
科研交流群
商业服务