The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012...
This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...
This survey was undertaken by Cefas as part of the CEFAS Historic surveys; Station and biological data collected during research surveys carried out by Cefas (formerly Directorate of Fisheries)...
Preliminary survey work for the Shrimp trial project. Ground truthing was conducted using a video camera sled and day grab to assess and identify areas of subtidal mixed sediment within boxes...