遇见数据集

Case Study for Decision-Dependent Uncertainty-Aware Distribution System Planning Under Wildfire Risk

收藏
IEEE2026-04-17 收录
官方服务:

资源简介:

The 54-bus distribution system provided in this dataset is based on the data provided in [1] and was developed in the line of research first reported in [2]. This dataset was used in the paper yet to be published, where we developed a model that can plan a distribution system considering wildfire-prone climate conditions. The model can make smart decisions about line investments and grid topology to reduce line failure probability and possible wildfires ignited by those failures.[1] G. Muñoz-Delgado, J. Contreras, and J. Arroyo, “Multistage generation and network expansion planning in distribution systems considering uncertainty and reliability,” IEEE Trans. Power Syst., vol. 31, no. 5, pp. 3715–3728, 2016.[2] A. Moreira et al., Distribution System Operation Amidst Wildfire-Prone Climate Conditions Under Decision-Dependent Line Availability Uncertainty, in IEEE Transactions on Power Systems, doi: 10.1109/TPWRS.2024.3353593. 

二维码
社区交流群
二维码
科研交流群
商业服务