遇见数据集

Site Development Plans

收藏
ArcGIS Hub2026-07-04 更新2026-07-05 收录
官方服务:

资源简介:

Includes plans that were identified historically as several types including Planned Building Groups (PBG), DP, MPBG, PD, etc.NOT included in these plans are General Development Plans (GDP), which are contained in a separate layer (PLAN_GENDEVPLAN_A) and Planned Unit Developments (PUD), which are identified within the Zoning layer (ZONE.ZONING_A).Since 2014 plan types are generically identified as Site Development Plans (SDP) which are defined as: Those plans representing projects that have gone through the Site Development Plan process (essentially zoning entitlements, ROW improvements, Stormwater/Wastewater infrastructure review, etc) and received an approval allowing the applicant to apply for building permits. The recordation provides 18 months of entitlement to their approved plan for the reviewing agencies. An approved SDP does NOT constitute building permit approval.Plans included may have a Status of "Recorded" (Recorded in the office of the Clerk and Recorder), which include a link to a digital copy of the plan, or "Under-Review" - which are not yet recorded (or may never be recorded) and do not include a link to the plan document.

本数据集涵盖历史上已被归类为多种类型的规划方案,包括规划建筑组团(Planned Building Groups, PBG)、DP、MPBG、PD等。本数据集未纳入的规划方案包括通用开发规划(General Development Plans, GDP)与规划单元开发(Planned Unit Developments, PUD):前者存储于独立图层PLAN_GENDEVPLAN_A中,后者则在区划图层(ZONE.ZONING_A)内完成标识。自2014年起,所有规划方案统一归类为场地开发规划(Site Development Plans, SDP),其定义如下:此类方案对应已完成场地开发规划流程(主要涵盖区划许可、道路通行权(ROW)改善、雨水/污水基础设施审查等环节)并获得审批,且申请人可据此申请建筑许可的项目。备案可为审批机构为获批方案提供18个月的许可有效期。获批的场地开发规划(SDP)并不等同于建筑许可的获批。本数据集涵盖的规划方案状态可分为「已备案」与「审核中」两类:「已备案」指已在书记员与记录员办公室完成备案,附带规划方案数字副本的下载链接;「审核中」指尚未完成备案(或可能永远不会备案),且未附带规划方案文档的下载链接。

创建时间:
2019-10-02
二维码
社区交流群
二维码
科研交流群
商业服务