Hunter Wetland Storm Recovery and Erosion Control – Stage 2
收藏资源简介:
This project will maintain stage one works. In addition, it will: (i) install erosion control measures and continue erosion control revegetation (including through log positioning); (ii) continue spreading heavier footpath base aggregate over 500m of path; (iii) shore up fence footings to build resilience in storms, continue weed control along the fence to buffer it and trim native vegetation branches that are threatening fences; (iv) remove fallen trees from near paths and in bush to avoid risk to people and use the fallen trees to create habitat for wildlife; (v) revegetating and regenerating areas damaged by the storm; and (vi) repairing damaged stormwater drains by replacing rocks that were displaced and fixing a 2m long walking bridge that was destroyed.