9A Injection: November 28 thru December 1, 2017
收藏官方服务:
资源简介:
Processed Gladwin Tensor Strainmeter, eddy current vertical strain and tilt, optical fiber areal strainmeter, and well pressure and injection rate data from the well 9A injection on November 28 thru December 1, 2017, at the North Avant Field, OK
创建时间:
2019-04-12



