Long Run Cost Benefit Rules
收藏数据链接:
官方服务:
资源简介:
I study a preference relation on risky long run public projects induced by a large maturity limit of expected present values. Under common assumptions this relation has a variational representation that is related to a well known model of ambiguity aversion; it is non-probabilistic in general. The
提供机构:
美国国家经济研究局创建时间:
2025-01-01



