前滩21-03项目监测数据表(地铁变形数据)
收藏资源简介:
面向前滩21-03项目施工,对邻近的上海轨道交通6号线、8号线、11号线的沉降、收敛等变形情况开展监测,通过人工全站仪测量、静力水准自动化测量、激光测距仪自动化测量等,及时掌握地铁变形情况,并将数据传输至课题的地下基础设施智慧集成平台,为平台提供基础数据支撑,通过平台集成的相关智能诊断模块,融合平台打通壁垒接入的基坑自身变形数据,对隧道的结构安全做出判断,从而保障地铁运营和市民乘客安全。
Aimed at the construction of the Qiantan 21-03 Project, this dataset monitors deformation indicators including settlement and convergence of the adjacent Shanghai Rail Transit Lines 6, 8 and 11. Multiple measurement methods are applied, such as manual total station survey, automated hydrostatic leveling monitoring, and automated laser rangefinder measurement, to timely acquire the deformation status of the subway. The collected data is transmitted to the intelligent integration platform for underground infrastructure of the corresponding research project, providing fundamental data support for the platform. Through the relevant intelligent diagnosis modules integrated on the platform, by fusing the foundation pit deformation data accessed after breaking through data silos across the platform, judgments on the structural safety of the tunnels can be made, thereby ensuring the safe operation of the subway and the personal safety of passengers.