遇见数据集

Radar database over large debonded areas into pavement structures

收藏
DataCite Commons2022-03-16 更新2024-07-13 收录
官方服务:

资源简介:

This database was collected over artificial disbonded areas during an accelerated pavement testing at IFSTTAR's carousel. GPR data have been collected over three artificial defects (tack-free, geotextile and sand-based), which were embedded between the top and the base layers. The data collection was organized in a two-stage experiments and covers the full life-cycle of the pavement structure. During the first stage that took place in 2012-13, data were collected at different stages from 0k to 300k loading cycles. The second measurement campaign was performed in 2019-2020 and lasted up to 800k loading cycles.

创建时间:
2020-10-15
二维码
社区交流群
二维码
科研交流群
商业服务