Results of 20000 Latin Hypercube Samples using 495 hour dispatch. Sensitivities are not included in these results and the the optimal system dispatch results are removed to reduce the file size. Th
These datasets of synthetic workflows (task graphs) were generated to evaluate the performance and scalability of a multi-objective and multi-constrained scheduling approach for workflow applications
ABSTRACT In this paper, we propose a novel MIP-based heuristic method to deal with a lot sizing and scheduling problem with multiple heterogeneous production lines in a production setting with perisha