遇见数据集

Data for: Design, Manufacturing, Acceptance Testing and Quality Control of ITER PF AC/DC Converters

收藏
Mendeley Data2024-06-25 更新2024-06-26 收录
官方服务:

资源简介:

The data contains short-circuited tests and temperature rise tests results of ITER PF converter unit components. Moreover, integration tests (no-load test, 6-pulse Converter Bridge full current test, voltage response test, circulating current mode test, parallel operation mode test, four-quadrant operation test and protective test with bypass triggering) on ITER PF converter unit are performed to verify whether the steady state and dynamic performance of the prototype meets the system requirements or not.

创建时间:
2024-01-23
二维码
社区交流群
二维码
科研交流群
商业服务