Transport: Scenario: Future Vehicle Mileage per Substation - Electric Vehicles (AG2030 & DFES2050)
收藏资源简介:
Author: Arup Creation date: 2025 Date of source data harvest: 2025 Temporal coverage: 2030-2050 Spatial Resolution: Primary Substation Supply Area Geometry: Polygon Source data URL: NEVIS Transport Data (not publicly available) Accelerated Green Scenario Data DFES Scenario Data UK Power Networks Primary Substation Distribution Areas Data terms of use: Data freely available for download and re-use, with appropriate attribution. Data attribution: - Dataset created by Arup as part of the Outer East London sub-regional LAEP, 2025. - Cenex, 2025 - Contains public sector information licensed under the Open Government Licence v3.0. - UK Power Networks, 2025. Workflow Diagram: View PNG Comments: The data and analysis developed for the sub-regional LAEP was undertaken using data available at the time and will need to be refined for a full Phase 2 LAEP. Whilst every effort has been made to ensure the quality and accuracy of the data, the Greater London Authority is not responsible for any inaccuracies and/or mistakes in the information provided.



