Seismic Performance of Pile-Wharf Connections_Specimen 10:Full Scale/T-Headed Bars/Unbonded
收藏数据链接:
官方服务:
资源简介:
Specimen 10 was similar to Specimen 9:Full Scale/T-Headed Bars/Reference, except that the T-headed connection steel was unbonded for 15 inches, centered about the end of the pile. Specimen 10 consisted of a precast concrete pile connected to a reinforced concrete deck through partial embedment and longitudinal T-Headed connnection steel.
创建时间:
2013-03-01



