The aim of this proposal is to carry out tests of the new backend instruments which cannot be carried out during standard maintenance periods. The scheduled time is used to measure beam shapes, determ
We propose to observe the magnetars 1E 1547.0-5408 and PSR J1622-4950 approximately weekly, to track their rotation, flux density, and polarisation, as we have been doing through this project. Also, a
To overcome the difficulty of having only part of compressor characteristic maps including on-design operating point, and accurately calculate compressor thermodynamic performance under variable worki
A collection of GIS data for the Myalup AEM interpretation and target selection report, this repository contains all shape files and grids that were used for the interpretation of the depth and extent